Sunday, September 11, 2011

AMPed up with Soffits

Week 17: The house seemed more quite than usual. Must be that it was mainly just John, our electrician, that was working form sunrise to sunset. I kept asking if he was sleeping there. He was there late into the evening and on Saturday. He has been working feverishly trying to get all the electrical conduit, switch boxes, and power receptacles in so that we can have our rough mechanical inspection on Monday. We also had the framers out to build the soffits and the stair wall. It is starting to take shape inside. If we pass the inspection then it is on to insulation. Next week also has the concrete guys out again to hopefully finish their part. We still need to have the pad poured for the AC outside, the two new piers under the stairwell, the window wells need to be finished, and they are working on the mudroom connection to the old house which had a leak. I also forgot to add a picture the other week of the new water meter. It has a Sensus RadioRead system that allows for radio signals to read the meter electronically. We are also working on finalizing the tiles, starting to get landscaping proposals, and Anne is starting the light fixtures. We bought one form a tent sale at the local hardware store for the mudroom ceiling. We also were out and about and purchased a slightly used espresso coffee system. It probably retailed in the upper $2K new and we got it for $200. Our village was having a sidewalk sale today and the owner was a kitchen designer who is moving to a smaller storefront ans was getting rid of many items that will not fit. We are now looking for a location to install in the new kitchen. Hopefully Mike can work his magic.


Here are the electrical boxes for the kitchen.







Kitchen lights.








More conduit around the existing plumbing.








The trifecta-heating, plumbing and electrical in the kitchen








More kitchen conduit and many lines going up to the master suite.









Maze of runs.







The conduit runs up in the master suite.











Here is the new wall for the stairs. We decided to keep the stairs open underneath rather than build the walls and have a few lighted niches. We like that you can see from the kitchen stairs all the way to the wall on the North.






Another view of the wall .







Here is the new water meter with the radio transmitter.








Here is the new design in the foyer. Since the stairs had to be moved due to the structural beam. we had to do something with the slant of the stairs. Ferd designed a cutout that we can either leave open or frame in and will have a down light to highlight. It is bumped out a little from the existing wall.







Also because of the beam location, the main dropped soffit size had to be reduced, but it still will look nice. There will be a LED ribbon light on the inside the circle.






A closer look at the drop soffit.









The soffit extends south a little past a main structural beam and then travels west and goes just past a steel pier and then goes back northward.





Here is what it looks like going past the steel piers









This was done also to hide the water line that is going to the master bathroom. Instead of drilling through the main structural beam, they piped it underneath it. The new soffit will hide that.





Here is the dropped framing for the dinning room light. Ferd has designed it for a nice pendant light. We more than likely will be getting an affordable one now and switch with a more contemporary art one later.





Here is a view underneath the dinning room framing.









This is another round framed soffit that will be over the island.








A closer look. Took a bit of time and effort to build but it is worth it.






Here it is with the 4 recessed light boxes. It took the electrician a lot of time to get all the boxes evenly spaced and centered. Looks more easy than it really was. We really like our electrician. He gives expert advice without being pushy. He makes great suggestions and gives his opinion.




We are also running data and voice cables to several locations with RJ6 (coax cable) for the TV's. We were hoping tho purchase a special bundle that has the wires we want together in one bunch, but of course they have them in older rated cables and the new ones are special order only. So, more labor for our electrician, but he is making his own bundles. He was successful in getting those wires pulled this week as well.

2 comments:

  1. Camerons has over 12 years experience in building and roofing in the Redcar and Middlesbrough area. We cover the whole of the North East and Teeside.We are proud of our reputation and commitment to customer service.
    Roofer hartlepool

    ReplyDelete
  2. That is really nice to hear. thank you for the update and good luck. Portable cabin

    ReplyDelete