Week 25:This week brought some more bad weather that created more issues with us being able to get the exterior siding finished. We are hoping for better weather this week, but it doesn't look too promising. In the meantime, we have the kitchen cabinets being installed and the master bath tub was installed. They will finish the master bath vanity early this upcoming week. They also swapped out the kids tub due to damage. Some of the lights we ordered are coming in and we have the exterior porch railing ordered. This next week, we are hoping to finish the siding and getting the rest of the hardwood floors installed. If the last pieces of the tile come in tomorrow and the floor lights on Tuesday, as they are scheduled, then the tilers will be in to finish up their work. We met with the shower door and mirror company and are having them come out to measure. The countertops will also be measured this week.
The top of the siding installed.
Joe measuring for the boards in the gable.
More siding to replace the boards that were the wrong size.
The finished front.
Working on the new addition side.
Here is the new master bath floor.
Here is the niche for the tub.
Closeup of the tile with the dark grout.
The tub built for a queen. It is now installed and ready for use.
Close up of the soaking tub.
Here they are starting to unpack the kitchen cabinets. This is the double oven cabinet.
Here they are dry fitting all the cabinets to their locations.
Cabinet being leveled and installed.
Another angle of the cabinets.
Completed installation of the cabinets on the south and west walls.
Here is the location of the dishwasher.
Upper cabinet with soft close doors.
Starting the build out for the refrigerator and pantry.
Cabinets installed with the opening for the refrigerator and coffee station on the left.
Here is where the island will be.
Here is the girls bathtub that was damaged.
Here is the cutout of the tub.
The replacement tub.
Lumber for the framing of under the stairs.
No comments:
Post a Comment